This 168mē property is located at 800m
from the Holy mosque. It is leased from one of the local for 12 years at $26,500 per annum
with the first two years free. The capital of this project is as follows:
- Construction cost (168mē x 6.5 stories x $270/mē)
|
$295,000 |
- Commissions to solicitors
|
$27,000 |
- Cost of engineering drawings & follow up with municipality
|
$12,000 |
- Cost of connecting electric power & sewer service
|
$71,000 |
Total: |
$406,000 |
|
|
%21 |
|
With a capacity of 235 pilgrimages, at $480 per person, return is as
follows: First year return (no rent) = 235 x 480 / 406,000 = %27.8
Less Dar Alamar commission %3
Net return on first year %24.8
- IROR for following 10 years = (235x480) - 26500 / 406,000 = %21.3
Less Dar Alamar commission %3 = %18.3 per
year
|
| Participation Open
With a $67,000 minimum / share |
|